The concrete mixing plant is a kind of temporary building, which can be demolished. In the structure selection, quick construction, installation and dismantling convenience should be considered. Therefore, the main station structure selects a fabricated steel structure. The mixing station we designed is composed of aggregate batching system, flat belt conveyor system, inclined belt conveyor system, mixer, screw conveyor, cement storage bin and other parts. The traction member and the load-bearing member of the belt conveyor is an endless tape, which is wound on the transmission roller and the reversing roller at both ends of the frame, and is tensioned by the tensioning device. The upper roller and the roller are used in the direction of the transmission length. The lower supporting rollers form a closed loop circuit. When the driving device drives the driving roller to rotate, the friction between the driving roller and the tape drives the tape to run. The storage silo is a place where bulk cement is stored. It usually consists of a silo body, tower caps, brackets and other parts. This mixing station uses SNC100F cement storage silo, which can hold 100 tons of cement. The main equipment of the tower cap part is a dust collector. The main components of the silo body are composed of an internal and external maintenance ladder, a discharge port, and an arch breaking device. Important parts of the bracket part include the middle maintenance platform, anchor bolts and so on. The focus of the design of the storage silo is the arch breaking device of the discharge port. At the same time, the strength calculation and verification of the silo body and the bottom bracket should be carried out to prevent the cement silo from expanding and breaking the bracket to cause safety hazards. The column feet of the steel structure of the storage silo bracket use the usual hinged form, which only transmits the vertical force and the horizontal force. The connection of beams, diagonal braces and columns between the columns is designed according to the hinged design, and the column feet are considered according to the hinge points. The steel frame structure has good stability and can withstand vertical loads and horizontal wind loads. The main and secondary beams of the platform are welded. When designing a steel-structure mixing plant, only plane static calculations are performed, and the approximate solution method of plane mechanics is usually used to solve this problem. This method is processed when the calculation methods are not perfect and are restricted by many preconditions. The calculation result is rough. The specific method in the design is: first simplify the overall structure of the warehouse body to a plane model, then add dead load, wind load, and seismic load, and obtain the most unfavorable combination of effects through load combination, and finally determine the beam through strength, stability, and deflection calculations, The cross section of the column.
Apr 08, 2021
Cement storage bin design
Send Inquiry
