Limestone storage silo is a tank for storing powdery materials in the mixing station. By storing powdered materials such as lime, it reduces the transportation cost and improves the working efficiency of the concrete mixing station. What preparations need to be made before the limestone silo is suspended?

1. In order to meet the load-bearing capacity requirements of the crane on the site, the crane operating site and the traversing site should be treated with hardening measures. The hardened site should be paving rubble 30cm thick and 15cm thick graded gravel on top.
2. Check the structure size of the concrete buttress and the plane position and elevation of the buttress steel plate, use the ink line to eject the position of the buttress, and at the same time pop out the support steel plate on the top of the buttress to install the sideline and check the horizontal flatness of the support.
3. Carry out the inspection before hoisting of all incoming equipment of the limestone silo. The performance of all mechanical equipment should meet the requirements of hoisting work. The verification of reliable performance under the condition of large turning radius lifting must be completed by trial hoisting.
Hengke Environmental Protection is a manufacturer specializing in the production of limestone storage silo. There are various specifications for customers to choose from. Customers are welcome to visit the factory and negotiate!
https://www.limesilo.com/